Exhibit,Title,Label,Value,Unit,Method / note,Sources 1,Four service dimensions to put in the RFQ,Flow,"Reference conditions, demand-duration profile and credible peaks",,BaiyX procurement framework; site engineering must determine requirements., 1,Four service dimensions to put in the RFQ,Pressure,Minimum required at critical users during actual demand events,,BaiyX procurement framework; site engineering must determine requirements., 1,Four service dimensions to put in the RFQ,Quality,Application-specific contaminants and moisture requirements,,BaiyX procurement framework; site engineering must determine requirements., 1,Four service dimensions to put in the RFQ,Availability,"Critical loads, allowable interruption and recovery arrangement",,BaiyX procurement framework; site engineering must determine requirements., 1,Four service dimensions to put in the RFQ,Site conditions,"Ambient, ventilation, electrical supply and cooling assumptions",,BaiyX procurement framework; site engineering must determine requirements., 2,Evidence ladder for compressor selection,Nameplate rating,Identifies nominal motor or package characteristics; insufficient for annual cost,,CAGI supports the verified-data layer; the procurement sequence is BaiyX analysis.,https://www.cagi.org/performance-verification 2,Evidence ladder for compressor selection,Comparable datasheet,"States package flow, power and test conditions",,CAGI supports the verified-data layer; the procurement sequence is BaiyX analysis.,https://www.cagi.org/performance-verification 2,Evidence ladder for compressor selection,Verified model data,Confirm exact scope and programme status; participation is not universal coverage,,CAGI supports the verified-data layer; the procurement sequence is BaiyX analysis.,https://www.cagi.org/performance-verification 2,Evidence ladder for compressor selection,Duty-weighted model,Applies relevant operating points to measured annual demand,,CAGI supports the verified-data layer; the procurement sequence is BaiyX analysis.,https://www.cagi.org/performance-verification 2,Evidence ladder for compressor selection,Site measurement,Confirms the installed system provides the required service,,CAGI supports the verified-data layer; the procurement sequence is BaiyX analysis.,https://www.cagi.org/performance-verification 3,Hypothetical five-year undiscounted lifecycle cost,Proposal A,399,US$ thousand,"6,000 hours/year; average input 90/78 kW; $0.12/kWh; capex $55k/$75k; maintenance $4k/$4.5k annually.", 3,Hypothetical five-year undiscounted lifecycle cost,Proposal B,378.3,US$ thousand,"6,000 hours/year; average input 90/78 kW; $0.12/kWh; capex $55k/$75k; maintenance $4k/$4.5k annually.", 4,Hypothetical efficiency-premium sensitivity,Tariff $0.06/kWh,"Net annual saving $3,820; simple payback 5.24 years",,BaiyX illustrative calculation; 12 kW average power difference must be supported by the actual duty profile., 4,Hypothetical efficiency-premium sensitivity,Tariff $0.12/kWh,"Net annual saving $8,140; simple payback 2.46 years",,BaiyX illustrative calculation; 12 kW average power difference must be supported by the actual duty profile., 4,Hypothetical efficiency-premium sensitivity,Tariff $0.18/kWh,"Net annual saving $12,460; simple payback 1.61 years",,BaiyX illustrative calculation; 12 kW average power difference must be supported by the actual duty profile., 4,Hypothetical efficiency-premium sensitivity,Discounted break-even,"Approximately $0.0802/kWh at 6,000 hours/year, 10%, five years",,BaiyX illustrative calculation; 12 kW average power difference must be supported by the actual duty profile., 4,Hypothetical efficiency-premium sensitivity,"3,000 hours/year",Annual energy saving halves; break-even tariff approximately doubles,,BaiyX illustrative calculation; 12 kW average power difference must be supported by the actual duty profile., 5,Hypothetical sequential savings: use the remaining baseline,Original baseline,500,thousand kWh / year,"Illustrative arithmetic only. Combined reduction is 20.8%, not 22%; actual measure interactions require system evidence.", 5,Hypothetical sequential savings: use the remaining baseline,After demand measure,450,thousand kWh / year,"Illustrative arithmetic only. Combined reduction is 20.8%, not 22%; actual measure interactions require system evidence.", 5,Hypothetical sequential savings: use the remaining baseline,After supply upgrade,396,thousand kWh / year,"Illustrative arithmetic only. Combined reduction is 20.8%, not 22%; actual measure interactions require system evidence.", 6,Hypothetical interruption cost,One hour,2,US$ thousand lost contribution,"$2,000/hour unrecoverable contribution; excludes repair costs. Compare event likelihood and backup costs separately.", 6,Hypothetical interruption cost,Four hours,8,US$ thousand lost contribution,"$2,000/hour unrecoverable contribution; excludes repair costs. Compare event likelihood and backup costs separately.", 6,Hypothetical interruption cost,Six hours,12,US$ thousand lost contribution,"$2,000/hour unrecoverable contribution; excludes repair costs. Compare event likelihood and backup costs separately.",